PLCDriveHubPLC, HMI, sensors, drives, controllers, robots, and factory automation parts for global industrial buyers.
China High Quality Hot Sale Swancor Cp95-P Polymer Vinyl Resin
Machine Vision Cameras

China High Quality Hot Sale Swancor Cp95-P Polyme | RFQ Sourcing Details

Machine Vision Cameras · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryMachine Vision Cameras
Unitset
CategoryMachine Vision Cameras
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Machine Vision Cameras. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

SWANCOR CP95-P SWANCOR CP95-P Description SWANCOR CP95 is a primer for lining concrete, which provides strong adhesion to concrete, excellent chemical resistance and good interlaminar adhesion to laminating polyester or vinylester resins.

Product Parameters SPECIFICATION Appearance Viscosity Gel time Shelf life :amber, clear liquid :100-300 cps (LVT#3-60rpm/25.C ) :15~35 min. (25.C, 6%Cobalt: 0.4phr, 100% DMA: 0.05phr, 55%M EKPO: 1.2phr) :6 months (under 25.C) USEBefore applying CP95, the foll owing properties of concrete must be confirmed. a.

Aging time is longer than 30 days b. Water content is lower than 8% c. Compression strength is larger than 3000 psi d. Adequate surface treatment. 2. Wood trowel is recommended to use on the final finish for concrete.

of cure characteristics may be caused by the variations of catalyst, humidity, pigment, fillers and other additives. It is recommended that the fabricator check the cure characteristics for a small quantity resin under operating conditions. 6. SWANCOR CP95 contain organic solvent (styrene).

Keep away from heat, spark and flame. 7. SWANCOR CP95 is a potential reactive chemical. Please store it in dark and keep away from heat and sunshine. 3.

Adequate surface treatment can be achieved by the following methods for removing the no-strength laitance layer of concrete, if metal trowel was used on the final finish for concrete. a. Chemical method:Romoving laitance by 10~12% HCl, following to wash by water b. Sand blasting c. Mechanical methods 4.

After SWANCOR CP95 is applied to substrate, laminate should be constructed Between 4 hours and 7 days .If it is tack-free, the surface of primer should be roughed before you laminate. 5. The gel time of SWANCOR CP95 is affected primarily by catalyst concentration and temperature.

The variations The data presented herein are believed to be accurate and reliable. We require customers to inspect and test our product before use and to satisfy themselves as to contents and suitability for th eir specific applications.

Information herein is to assist customers in determining whether our products are suitable for their applications but not to be taken as a guarantee, express warranty or implied warranty of merchantability or fitness for particular purpose, nor is a ny protection form any law or patent to be inferred.

All patent rights are reserved. The excl

China | Applications and Buyer Notes

China is organized as a sourcing-ready Machine Vision Cameras reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time ques

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Machine Vision CamerasBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryMachine Vision Cameras
Unitset

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

PLCDriveHub related sourcing paths

Related applications PLCDriveHub related paths

Machine Retrofit Projects

Robotic Picking And Inspection

Related solutions PLCDriveHub related paths

Sensor And Drive Integration

PLCDriveHub procurement phrases

PLCDriveHub related product samples