PLCDriveHubPLC, HMI, sensors, drives, controllers, robots, and factory automation parts for global industrial buyers.
Frequency Drive Acs880 Inverter Acs A4/03A3/04A0/05A6/07A2/09A4/12A6/017A/025A/032A/038A/045A/061A/072A/087A/105A/145A/169A/206A/246A/293A/363A-3 a-B-B
Port And Wharf Equipment

Frequency Drive Acs880 Inverter Acs A4/03A3/04A0/05A6/07A2/09A4/12A6/017A/025A/032A/038A/045A/061A/072A/087A/105A/145A/169A/206A/246A/293A/363A-3 a-B-B

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Quote on request

Frequency | Applications and Buyer Notes

Frequency is organized as a sourcing-ready Port And Wharf Equipment reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-tim

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
PLC, HMI and ControllersBased on visible page data; confirm exact value in the RFQ.
Brand
NoneBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Application
Electrical and power distributionBased on visible page data; confirm exact value in the RFQ.
Capacity
100.000kgBased on visible page data; confirm exact value in the RFQ.
Feature Highlights
digitalBased on visible page data; confirm exact value in the RFQ.
Function
Constant Torque Universal TypeBased on visible page data; confirm exact value in the RFQ.
Link of Transformation
AC-DC-AC Variable-Frequency DriveBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Product sourcing profile

CategoryPort And Wharf Equipment
Inquiry workflowPlatform RFQ workflow
AvailabilityInquiry required
Updated2026-05-04

Product introduction

Home Electrical & Electronics Variable-Frequency Drive Frequency Drive Acs880 Inverter Acs A4/03A3/04A0/05A6/07A2/09A4/12A6/017A/025A/032A/038A/045A/061A/072A/087A/105A/145A/169A/206A/246A/293A/363A-3 a-B-B US$500.00-7,000.00 1 Piece-led product discovery for buyers looking for plc, hmi and controllers options. The page is organized around specification review, application fit, and inquiry-ready comparison.When evaluating this product, buyers should confirm application fit, required performance range, installation environment, lead time, documentation, and whether the supplier can support OEM or project quotations. Current vertical focus: plc, hmi, sensors, drives, controllers, robots, and factory automation parts sourcing and rfq-ready export supply platform.servoplchmi

Selection and RFQ points

Review material fit, application context, alternatives and RFQ detail before comparing related product paths.

Material fit Port Wharf Equipment

Confirm material, size, finish, tolerance and processing needs before price comparison.

Application fit application, operating environment and usage frequency

Add the target application and operating context so related products can be compared correctly.

Alternative path Hmi Controllers

Use nearby materials, equipment types or category pages when this record is close but not exact.

RFQ detail Quantity, destination, timing

Include quantity, destination, target delivery window, packaging and any technical constraints.

Key specifications

CategoryPLC, HMI and Controllers
Brand
Unitset
ApplicationElectrical and power distribution
BrandNone
Capacity100.000kg
CategoryPLC, HMI and Controllers
Feature Highlightsdigital
FunctionConstant Torque Universal Type
Link of TransformationAC-DC-AC Variable-Frequency Drive
ListACS A4-3
Main Circuit TypeVoltage
Matched Termsservo, plc, hmi
Model NO.ACS A4-3
Nature of DC PowerCurrent Variable-Frequency Drive
OriginChina
Output TypeTriple
Power250 kw
Principle of WorkV/F Control Transducer
Product TitleFrequency Drive Acs880 Inverter Acs A4/03A3/04A0/05A6/07A2/09A4/12A6/017A/025A/032A/038A/045A/061A/072A/087A/105A/145A/169A/206A/246A/293A/363A-3 a-B-B
Refund policyClaim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secure paymentsEvery payment you make on Made-in-China.com is protected by the platform.
Shipping Cost.
SpecificationR1-R9
Switch ModePWM Control
TrademarkA-B-B
Transport PackageCarton/Wooden Box
US$500.00-7,000.001 Piece (MOQ)
Voltage690 v
Voltage of Power SupplyLow Voltage Variable-Frequency Drive
as Standard IP21/UL Type 1Enclosure Class, IP20 & IP55/UL Type Open & 12 as
listACS A-3
up to 250 Kw/350 HPWide Power Range All The Way From 0.55 Kw/0.75 HP
up to 690 VWide Voltage Range All The Way From 230 V
up to 9 YearsMaintenance Interval

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Related keyword paths

Grouped by the product keyword that generated the related path.

SOURCING DECISION BRIEF

Frequency Drive Acs880 Inverter Acs A4/03A3/04A0/05A6/07A2/09A4/12A6/017A/025A/032A/038A/045A/061A/072A/087A/105A/145A/1...

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Category
PLC, HMI and Controllers
Price status
Quote on request
Inquiry model
Structured product RFQ with quantity, destination and technical requirements.
Availability
Confirm by inquiry
Sourcing lens
Product detail to shortlist decision
Primary compare
Category, Brand, Unit
Record focus
Frequency Drive Acs880 Inverter Acs A4/03a3/04a0/05a6/07a2/09a4/12a6/017a/025a/032a/038a/045a/061a/072a/087a/105a/145a/169a/206a/246a/293a/363a 3 A B B
Category focus
Port And Wharf Equipment
Buyer checklist
  • Category fit: Confirm whether the product belongs to the right category and nearby application path before outreach.
  • Specification depth: Review the visible specifications and convert missing fields into a clearer RFQ requirement set.
  • Route expansion: Use adjacent category, solution and procurement routes before settling on one detail page.
How should buyers use this detail page?

Use the detail page as a product-fit checkpoint. Confirm category placement, visible specifications and adjacent sourcing paths before sending an RFQ.

What should buyers compare first?

Compare the visible specifications, category fit and the nearest application or solution routes before asking for supplier options.

PLCDriveHub related sourcing paths

PLCDriveHub procurement phrases

PLCDriveHub project-fit checks

Application Confirm Application before comparing offers or moving the inquiry forward.
Country Confirm Country before comparing offers or moving the inquiry forward.
Capacity Confirm Capacity before comparing offers or moving the inquiry forward.
Material Confirm Material before comparing offers or moving the inquiry forward.
Application route Use Application to compare adjacent options instead of relying on one broad title match.
Country route Use Country to compare adjacent options instead of relying on one broad title match.

PLCDriveHub related product samples

Procurement notes

If visible specifications are still thin, add model, material, interface, quantity, application fit, destination and target lead time before comparing quotes.

Next sourcing actions